Nevantin Services logo
Two bucket trucks with brand-striped cabs and booms stowed on a level gravel shoulder at sunrise, four crew members in vests and hard hats beside them, poles carrying power conductors with a telecom cable band below, a wide empty sky over open grassland to the left

STA 0+00 · Garland, Texas

Utility contractor EPCEngineering, Procurement, and Construction. One contract from design through material sourcing to built-and-tested delivery.Fiber, HDD & Dry utilities

Aerial Underground Plowing Boring / HDD Drops & Splicing Testing & turn-up Restoration Emergency response
INFLATION REDUCTION ACT IRA PWA INFLATION REDUCTION ACT IRA PWA PREVAILING WAGE & APPRENTICESHIP Wage determinations & apprentice hours FEDERAL CONTRACTS DAVIS-BACON FEDERAL CONTRACTS DAVIS-BACON DBA · DBRA Certified payroll WH-347, weekly FEDERAL BROADBAND BEAD FEDERAL BROADBAND BEAD BUILD-READY Prevailing wage & BABA Proven on funded networks

STA 1+00 · The people

Who answers the phone.

John C. Wood

John C. Wood

Co-Founder, President & CEO

A decade of industrial executive leadership and corporate banking; directs strategy and infrastructure execution.

Jonathan Jones

Jonathan Jones

Co-Founder & VP

Decades of executive, operational, and field experience; large-scale distribution logistics and QA/QC.

David T Hoover

David T Hoover

COO

Software engineering and energy-sector background; runs operations and the field-management tooling behind them.

Eddie Holliman

Eddie Holliman

VP of Hyperscale Development and Infrastructure Partnerships

Luke Holmes

Luke Holmes

VP of Operations, Western Division

Gary Norris

Gary Norris

Director of Operations

STA 1+50 · First contact

Tell us what you're building.

One email address, one phone number. Both land with people who build, not a form queue.

Start a conversation

STA 2+00 · Pick your seat

You already know
what you're buying.

EPC, GC, or Sub. Skip the tour: each path below speaks your language and ends in the next step you'd actually take.

Land developmentDevelopers

Fiber to every lot, water and sewer in the same mobilization. Joint trench and directional bores built to your paving calendar, so streets are not recut after first occupancy. Licensed where you build.

Network operatorsISPs & co-ops

OSP construction to your spec, not a generic FTTH brochure. Every type of fiber scope: aerial, plow, HDD, splicing, testing, turn-up. Co-op joint-use aware, NRECA member, ISNetworld and Avetta current, and already building under funded-program compliance.

BEAD · ReConnect · CPFGrant winners

Your award came with obligations. The machinery already runs here. BABA materials control, certified payroll (WH-347, weekly) and wage determinations when the funding stack requires it, SAM.gov active, registered in 12 states.

Civil & energy primesPrime GCs

HDD and fiber scope under one subcontract. Bores for fiber, water, sewer, and gas in one mobilization. ISNetworld and Avetta current; COI and references on request.

Data center & long-haulHyperscale

Diverse laterals, long rural bores, high-count fiber, badged crews. Campus OSP and route work at industrial safety standard, on schedule to COD. Eddie Holliman, VP of Hyperscale Development and Infrastructure Partnerships, takes the first call.

STA 3+00 · Where we're registered

12 states. Real numbers.
Every one a page.

Each state below links to a working reference for building there: one-call systems, soils, licensing, and who we build for. The registration data is on the card, not behind a hover.

Screenshot the card you need. Your procurement file wants the number, the status, and the entity type; they're all here, and every card opens that state's build guide.

STA 4+00 · The work

Every step of the build,
our crews.

Fiber subcontracting and general contracting across every type of fiber scope, HDD, and gas-water and dry utility construction. Named methods, not "comprehensive solutions."

Open joint utility trench in a new subdivision with fiber conduit, water pipe, and sewer pipe laid together

Joint trench & underground

Conduit, pull boxes, water, and sewer in one open trench, restored to grade.

Fusion splicer joining optical fiber inside a splicing trailer

Splicing & testing

Splice, test, turn-up, and the documentation that survives closeout.

Directional drilling

Crossings and congested corridors for fiber, water, sewer, and gas.

Bucket truck crew working a rural pole line at golden hour with a fiber reel trailer staged

Aerial construction

Pole line work and lashing on rural and joint-use plant.

Aerial Underground Plowing Boring / HDD Splicing Testing & turn-up Restoration Emergency response

STA 5+00 · Work for us

We hire subs.
Selectively.

Onboarding here is deliberately demanding, and that is the point. We treat ourselves, and our subs, with the highest degree of business respect: terms in writing, safety on the record, payment authorization squared away before the first locate ticket. Five documents, downloadable right now, so you know exactly what you are signing up for before you call.

Mutual Confidentiality AgreementProtects both sides
Master Subcontractor AgreementThe working terms
Subcontractor Safety Pre-Qualification FormYour safety record
IRS W-9 (blank)Standard IRS form
Vendor Payment Authorization AgreementHow you get paid
Download the onboarding packet Introduce your crew

One zip, 1.4 MB, all five documents. Read them first; crews that clear this file tend to stay on the bore path with us.

“The question really is, are you improving the world?”

Jeff Bezos

Civilization Begins Underground

STA 6+50 · Learn

How this work actually gets built

26 working articles, written for the people this work touches: buyers comparing methods, homeowners watching a crew work their street, and people considering the trade. No gating, no forms; the same explanations our crews give on site.

Visit the learn hub

STA 8+00 · Exit pit

One call. One email.
A human reads both.